Your bathroom, finally done right.
From a simple vanity swap to a full down-to-studs remodel, Jeff handles the whole project. Tile, plumbing rough-in, electrical, carpentry, paint. One quote, one craftsman, one year workmanship guarantee.
Why the bathroom remodel comes out right.
Most bathroom remodels fall apart because too many people touch the project. A tile guy does tile. A plumber does plumbing. A carpenter does carpentry. Each one shows up late, leaves early, and blames the other when something is wrong. Jeff does it all himself. That is why our bathrooms come out looking like the photos instead of like a compromise.
Request a Quote
What the quote covers.
Clear scope, written quote, no surprises. If something is not on the list, we tell you up front rather than bury it in a change order.
Included
- Full and partial bathroom remodels
- Shower makeovers and custom tile showers
- Tub makeovers and refinishing
- Tub-to-walk-in-shower conversions
- Shower-to-tub conversions
- Vanity install, remove, or replace
- Countertop install (quartz, granite, marble)
- Bathroom fixture change-out (sinks, faucets, toilets)
- Grab bars and ADA modifications
- Enlarging doorways for handicap access
- Tile floors, walls, and custom shower surrounds
- Drywall, texture matching, paint, trim, and finish carpentry
Not included (we will tell you up front)
- Whole-home repiping (separate major plumbing job)
- Panel replacement or whole-home rewire
- Structural changes requiring engineer stamp
The bathroom remodel process.
Free in-home quote
Jeff walks the bathroom with you. You show us what you have, describe what you want, and we talk through what is realistic for your budget and the space.
Written quote
Within a few days you get a clear written quote with scope, materials, and timeline. No hourly surprises.
Material selection
We guide you to tile, fixtures, and finishes at your price point. We have supplier relationships that save you money versus walking in cold to a showroom.
Execution
Typical full bathroom takes 2 to 4 weeks depending on scope. We protect the rest of your home and clean up at the end of every work day.
Final walkthrough
We walk the finished bathroom with you. Anything off the scope gets fixed before final payment.
Projects we have recently done.
- Master bath with navy marble shower, double vanity, freestanding tub
- Guest bath update with new vanity, mirror, lighting, floor tile
- Tub-to-walk-in-shower conversion for aging-in-place accessibility
- Half bath tile and paint refresh
Honest numbers.
Bathroom remodels are quoted per project, not per hour. Scope, material quality, and size drive the price. A guest bath refresh is very different from a full master bath gut, and we will be straight with you about what each approach costs.
No pressure. No hourly games. We quote the project, we stand behind the quote, and the final number is what you pay unless you change the scope.
Get a Written Quote
Bathroom Remodel FAQ.
How long does a bathroom remodel take?
Guest bath refresh: 5 to 10 working days. Full master bath gut: 3 to 5 weeks. We give you a specific timeline in the written quote.
Can you help me pick tile and fixtures?
Yes. We have preferred suppliers and will walk you through selections at your budget. You make the calls; we keep you out of expensive mistakes.
Do I need a permit?
Depends on scope. Cosmetic work (tile, fixtures in existing locations) often does not need a permit. Plumbing rough-in relocation or major electrical does. We handle permit pulls when required.
What about during the remodel?
If this is your only bathroom, we coordinate the work in phases so you are never without basic function for more than a day or two. Plan ahead if you have one bathroom in the home.
